MACROLINK RESOURCES ZAMBIA LIMITED (新华联资源赞比亚有限公司) is a copper mining and processing enterprise registered in the Republic of Zambia.
Our mining area is strategically located 26km northwest of Ndola and 345km from Lusaka, with the mineral rights boundary only 600m away from the Congolese border. The mining rights area covers 366 hectares with an industrial site area of 48 hectares.
The company is currently in the construction phase, with surface facilities including the hoist house, power distribution room, air compressor room, maintenance workshop, and office/living areas already completed. The 11KV backup power supply, 33KV main power line, and 33KV/11KV substation are operational.
1. Bringing long-term benefit for the enterprise's employees, directors & Zambia
为企业的员工、股东和赞比亚带来长期利益
2. Copper enterprise with safe profit
安全第一,兼具效率
3. Living in harmony with the communities
融入当地,社企共建
1. All injuries & accidents could be avoided
任何事故都可被避免,安全即效率
2. The best form of business is to live in harmony with the community
企业的最佳形态是与社区和谐共生
3. Effective employee training for sustainable development
有效培训员工,实现长效发展
We value and respect all individuals, cultures, and communities we work with.
We believe in collaborative efforts and working together to achieve common goals.
We continuously seek innovative solutions and improvements in our operations.
We are dedicated to excellence in all aspects of our business and community engagement.
We strive for excellence in everything we do, from mining operations to community relations.
We conduct our business with honesty, transparency, and ethical standards.
Our mining operations utilize advanced technology and methods to ensure efficient and sustainable copper extraction and processing.
Our mine is currently in the construction phase with expected completion by the end of 2025 and production commencing in June 2026.
Total project investment of approximately CNY 650 million, covering mining system, mineral processing system, tailings system, and auxiliary facilities.
Our mine adopts a vertical shaft development system with underground trackless transportation, including the main shaft, auxiliary shaft, and ventilation shaft.
Designed depth of 1,181 meters, already excavated and lined to the target depth. Primarily used for ore hoisting through the main shaft skip.
Serves as a multi-purpose shaft for personnel, materials, equipment, and waste rock transportation, also functioning as the intake air shaft.
Currently excavated and lined to the +1,000m level, acts as the main return air shaft for the mine's ventilation system.
Our mineral processing primarily adopts the crushing-ball milling-flotation method, with the final product being copper concentrate.
Initial processing stages to break down and grind the ore to the appropriate size for efficient mineral extraction.
Advanced flotation technology to separate and concentrate the copper minerals from the ore.
High recovery rate of 97.42% with concentrate grade of 42%, ensuring maximum value extraction from the ore.
Our mining area includes comprehensive facilities and infrastructure to support efficient and sustainable operations.
Completed surface facilities include hoist house, power distribution room, air compressor room, maintenance workshop, and office/living area covering 3,640 square meters.
Operational 11KV backup power supply, 33KV main power line, and 33KV/11KV substation to ensure reliable power for all operations.
Dedicated living areas for Zambian staff, Zambian managers, and contractors, creating an ecological, garden-inspired mining complex with superior living conditions.
Our mine adopts a vertical shaft development system with underground trackless transportation for efficient operations.
Our underground mining is designed for an annual capacity of 750,000 tons using advanced methods and equipment.
Our processing facilities utilize the crushing-ball milling-flotation method to produce high-quality copper concentrate.
Our tailings management system ensures environmentally responsible handling and storage of mining waste.
Main shaft lifts ore with mighty power; Auxiliary shaft runs silent and efficient. Working in tandem, they form the mine's foundation.
The breathing pulse of the mine, safeguarding freshness and safety in the heart of the earth.
A symphony of machinery and wisdom, transforming raw ore into gleaming value.
Our processing facilities utilize the crushing-ball milling-flotation method to produce high-quality copper concentrate.
Our team is ready to answer your questions about our mining operations and corporate initiatives.
Contact UsHectares Mining Rights
Zambian Employees
Technical Professionals
School Uniforms Donated
Organizing the "Macrolink Cup" charity football match in Mwekera area every year.
DC Ndola presents trophies to the winning team.
Macrolink is a major sponsor of Copperbelt tree planting events.
Donated 200 school uniforms for 100 boys and 100 girls at Mitenge community school.
"If you want SUCCESS, first you must build a road to it." - Chinese Proverb
"要致富,先修路" - 中国谚语