项目概况 | Project Overview

Mining Operations & Technology

The mine is currently in the construction phase with expected completion by the end of 2025 and production commencing in June 2026.

Surface facilities such as the hoist house, power distribution room, air compressor room, maintenance workshop, and office/living area (covering 3,640 square meters) have all been completed. The 11KV backup power supply, 33KV main power line, and 33KV/11KV substation are already operational.

Based on the investment budget (in RMB), the total project investment amounts to approximately CNY 650 million, covering the mining system, mineral processing system, tailings system, and public auxiliary facilities.

750K Annual Capacity (tons)
2026 Production Start
650M Total Investment (CNY)
Mining Development at MACROLINK RESOURCES

Overview of our shaft development system, showcasing our advanced mining infrastructure.

采矿系统 | Mining System

Shaft System & Underground Mining

Main Shaft

Designed depth of 1,181 meters, already excavated and lined to the target depth. Primarily used for ore hoisting through the main shaft skip.

Auxiliary Shaft

Serves as a multi-purpose shaft for personnel, materials, equipment, and waste rock transportation, also functioning as the intake air shaft.

Ventilation Shaft

Currently excavated and lined to the +1,000m level, acts as the main return air shaft for the mine's ventilation system.

Underground Mining

State-of-the-art mining technology for efficient and safe extraction

选矿工艺 | Ore Processing

Mineral Processing Technology

Crushing

Initial processing to break down the ore

Ball Milling

Grinding the ore to appropriate size

Flotation

Separating and concentrating copper minerals

Copper Concentrate

Final product

Advanced Processing Technology

The mineral processing primarily adopts the crushing-ball milling-flotation method, with the final product being copper concentrate. The tailings are thickened and dewatered before being transported via pipeline to the tailings storage facility for disposal, while a portion is sent to the backfill station for underground stope backfilling.

97.42% Recovery Rate
42% Concentrate Grade

Processing and Backfill System

Our state-of-the-art processing facility ensures maximum recovery of valuable minerals while maintaining environmental responsibility through our tailings management system.

资源模型 | RESOURCE MODEL

Ore Body Model & Development System

Our comprehensive resource model provides accurate estimations and efficient development systems for optimal mining operations.

Resource Estimation

Measured Resources

12.7 million tons

Average Grade

2.18%

Copper Metal

220kt

Development System

Primary Development

Vertical shaft

Loading

Mobile fleets

Transporting

Rail

Hoisting

Skips

Production Capacity

0.75-1mt/a

Ore Body Model

3D Ore Body Model

Comprehensive visualization of mineral deposits and development systems